FOR DEVELOPER

Detailed Engineering

  • Detailed engineering consulting team has experience of more than 25 projects and matches best in industry
  • We have also identified specific committed resource for each design and detailed engineering component. The middle level working team is also highly experienced and has exposure to detailed engineering for top corporates in hydro sector
  • A detailed methodology for detailed designs for small and samll hydro projects, in line with CEA / CWC / AHEC guidelines is being followed.
  • A stage wise list of about 100 critical detailed design drawings per project has been prepared, and 80-85% detailed engineering (including release of “good for construction” civil and structural work drawings”) would be possible to complete for less than 25 MW project in a period of 11-12 months (subject to the developer providing necessary design inputs in time).
  • Hydro-mechanical and electro-mechanical work drawings would flow appropriately according to project stage.
  • Necessary software / formats for detail designs are available with the company / its consultants.
TOP